RtB Training – Boones Ferry Donald
Description
A repeat of last month's snow/ice cancelled ride. Leaves from Tualatin Community Park. Elevation gain of 1350 feet, with maximum elevation of 429 feet and maximum 6.4% grade. Included is the one mile crossing of the Willamette River on the shoulder of Interstate 5. Also ride for 3 miles on the shoulder of Hwy. 99W between Newberg and Sherwood. No planned coffee stop along the route, so bring some additional fuel sources. Snow or ice cancels, check the online calendar or call me if in doubt.
Details
Date:
Sunday March 17th, 2019
Departure Time:
10:00 am
Type: Re-Group
Pace: Brisk (15-17 mph)
Distance:
miles
Terrain:
A terrain has not been specified
Maps:
Start Location
Tualatin Community Park Tennis Courts, Southwest Tualatin Road, Tualatin, OR, USA
Google Maps